Quick answers
What is "Ordinary Sand Mining" from Riverbed of Yamuna River?
"Ordinary Sand Mining" from Riverbed of Yamuna River is a proposed mining project in Behmai, Sikandra, Kanpur Dehat, Uttar Pradesh. The site covers 74.1 acres.
Who is building it?
The applicant is Nand Kishor.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Behmai, Sikandra, Kanpur Dehat, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5.7 crore and a site of 74.1 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Yamuna River at Village- Behmai, Gata No.- 826मि0/01, Lease Area- 30.00 ha., Tehsil- Sikandra, District- Kanpur Dehat, Uttar Pradesh, Project Proponent- M/s Bala Ji Associates (Prop. - Shri Nand Kishore) |
|---|---|
| Status | Under environmental review |
| Status since | 4 Nov 2026 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Nand Kishor |
| Land area | 74.1 acres (30 ha) |
| Project cost | ₹5.7 crore |
| Village / locality | Behmai |
| Taluk / tehsil | Sikandra |
| District | Kanpur Dehat |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03148 |
In context
32 applications in Kanpur Dehat since January 2022 are in the same category (Mining): 21 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 74.1 acres, this one is larger than 97% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Behmai, Sikandra, Kanpur Dehat, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" along Yamuna Riverbed from Gata No 826mi/2, Area 25ha — under environmental review, 600 m away
- "Sand Mine" from Riverbed of Yamuna River — more information requested, 1.8 km away
- "Sand Mine" from Riverbed of Yamuna River — cleared for impact study, 1.8 km away
- "Sand Mine" from Riverbed of Yamuna River — under environmental review, 2.3 km away
- "Sand Mine" from Riverbed of Yamuna River — cleared for impact study, 2.3 km away
- Sand/Morrum Deposit Quarry at Khand No.- 208/1 & 208/4, Village- Khojarampur… — environmental approval granted, 2.3 km away
- Sand/Morrum Deposit Quarry at Khand No.- 208/1 & 208/4, Village- Khojarampur… — cleared for impact study, 2.3 km away
- Sand/Morrum Deposit Quarry at Khand No.- 01, Gata No. 2059 & 2060, Village-… — environmental approval granted, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.