Cleared for impact studyBuildings & townships · Ghaziabad, Uttar Pradesh

Proposed Group Housing Project at Khasra No. 939, 940, 948, 949, 950, 954, 955 & 956, Revenue Village - Mahrauli, NH-24, Tehsil & District Ghaziabad, Uttar Pradesh by M/s Karyan Buildcon Pvt. Ltd.

Proposed Group Housing Project at Khasra No. 939, 940, 948, 949, 950, 954, 955 & 956, Revenue Village - Mahrauli, NH-24, Tehsil & District Ghaziabad, Uttar Pradesh by M/s Karyan Buildcon Pvt. Ltd is a proposed residential project in Mahroli, Ghaziabad, Uttar Pradesh. It plans 608 units in 3 towers of up to 39 floors on 1.7 acres. Its stated project cost is ₹95 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Nov 2025).

See it on the live map All projects in Ghaziabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing Project at Khasra No. 939, 940, 948, 949, 950, 954, 955 & 956,…

Project details

StatusCleared for impact study
Status since18 Nov 2025
Application filed26 Aug 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantKaryan Buildcon Private Limited
UseResidential
Units608
Towers3
Floors (tallest)39
Basements3
Height200 m
Parking spaces1,178
Land area1.7 acres (0.7 ha)
Built-up area2,07,310 m² (22,31,464 sq ft)
Plot area23,657 m² (2,54,642 sq ft)
Project cost₹95 crore
Village / localityMahroli
Taluk / tehsilGhaziabad
DistrictGhaziabad
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03245

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 2 Jan 2026Environmental approval granted1.7 acres₹95 crore
Early planning filed 26 Aug 2025 (this page)Cleared for impact study1.7 acres₹95 crore
Early planning filed 11 Apr 2025Returned to applicant1.7 acres₹95 crore

In context

154 applications in Ghaziabad since January 2022 are in the same category (Buildings & townships): 95 approved, 43 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is smaller than 86% of them.

48 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mahroli, Ghaziabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Karyan Buildcon projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.