One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Group Housing project at Plot No. GH-11, Sector-22-D Yamuna Expressway, Gautam…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 14 Nov 2025 |
| Application filed | 6 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Arihant Urban Space Private Limited |
| Use | Residential |
| Units | 1,028 |
| Floors (tallest) | 30 |
| Basements | 2 |
| Height | 123 m |
| Parking spaces | 1,880 |
| Land area | 11.3 acres (4.6 ha) |
| Built-up area | 2,94,591 m² (31,70,948 sq ft) |
| Plot area | 45,732 m² (4,92,255 sq ft) |
| Project cost | ₹1,180 crore |
| Village / locality | Kherli Bhau |
| Taluk / tehsil | Gautam Buddha Nagar |
| District | Gautam Buddha Nagar (Noida) |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03254 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Dec 2025 | Environmental approval granted | 11.3 acres | ₹1,180 crore |
| Early planning filed 6 Aug 2025 (this page) | Cleared for impact study | 11.3 acres | ₹1,180 crore |
In context
430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.3 acres, this one is larger than 62% of them.
39 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kherli Bhau, Gautam Buddha Nagar, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Group Housing project at Plot No. GH-11, Sector-22-D Yamuna… — environmental approval granted, 0 m away
- Proposed Group Housing project "GAUR CHRYSALIS" at Plot No. GH- 12, Sector- 22… — environmental approval granted, 150 m away
- Proposed Group Housing project "GAUR CHRYSALIS" at Plot No. GH- 12, Sector- 22… — cleared for impact study, 150 m away
- Proposed Group Housing project "GAUR ALARIS" at Plot No. GH- 13, Sector- 22 D,… — environmental approval granted, 300 m away
- Proposed Group Housing project "GAUR ALARIS" at Plot No. GH- 13, Sector- 22 D,… — under environmental review, 300 m away
- Environment Clearance for Commercial Center C-1 at Plot No. TS-01B, Sector… — environmental approval granted, 1.1 km away
- Environment Clearance for Commercial Center C-1 at Plot No. TS-01B, Sector… — withdrawn, 1.1 km away
- Group Housing Project at Plot No. P5 & P6, in TS-02/ A, Sector- 22D, YEIDA,… — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.