Quick answers
What is this project?
"Building Stone (Sand Stone)" Project at Gata No.- 399 Mi (Hall A. No.- 754, Present Hall A. No.- 588), Village- Jigna, Tehsil- Chunar, District- Mirzapur, U.P. (Leased Area : 1.01 ha./ 2.50 Acre), Lessee- Shri Kumud Kumar S/o Shri Parasnath is a proposed mining project in Jigna, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Kumud Kumar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jigna, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹78 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 5 May 2025.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 5 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kumud Kumar |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹78 lakh |
| Village / locality | Jigna |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03267 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
25 other mining leases have applied within 500 m of this site; together with this one they cover 86.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 62 mining leases have applied within 5 km.
Where it is
Jigna, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Building Stone (Sand Stone)" Project at Gata No.- 399 Mi (Hall A. No.- 754,… — under environmental review, 150 m away
- "Building Stone (Sandstone)" Mine — lapsed, 150 m away
- Dhuriya Building stone Sand Stone Mining project — environmental approval granted, 200 m away
- Dhuriya Building stone Sand Stone Mining project — cleared for impact study, 200 m away
- Building Stone (Sand Stone) — environmental approval granted, 200 m away
- Building Stone (Sand Stone) — cleared for impact study, 200 m away
- Proposed "Sand Stone Quartizite Bailast Gitti" Project at Gata No.- 754,… — under environmental review, 250 m away
- Proposed "Building Stone (Sand Stone)" Project at Gata No.- 428, Village-… — cleared for impact study, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.