Project details
| Official title | Environmental clearance of proposed ordinary soil mining at Gata/Khasra Nos. 2, 14 and 424 Area – 3.1583 ha at Village- Imratpur Udhaw, Tehsil –Bilari, District - Moradabd, Uttar Pradesh of Shri Banti. |
|---|---|
| Status | Environmental approval granted |
| Status since | 14 Mar 2026 |
| Application filed | 4 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Banti |
| Land area | 7.8 acres (3.2 ha) |
| Project cost | ₹17 lakh |
| Village / locality | Imratpur Udho |
| Taluk / tehsil | Bilari |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03268 |
In context
38 applications in Moradabad since January 2022 are in the same category (Mining): 33 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.8 acres, this one is larger than 84% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Imratpur Udho, Bilari, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- ''Ordinary Soil Mining Project" at Gata No.- 66, 167, 171, 184, Village-… — environmental approval granted, 750 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 1.9 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 1.9 km away
- Ordinary Soil Excavation Mine — environmental approval granted, 2.3 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 2.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — under forest review, 2.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Diesel… — lapsed, 3.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — lapsed, 3.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.