Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Sept 2025 |
| Application filed | 27 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anil Kumar Nishad |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Kharaitiya |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03296 |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.8 acres, this one is smaller than 81% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 25.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 45 mining leases have applied within 5 km.
Where it is
Kharaitiya, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Gitty/Boulder (Dolostone) Mining Project" located at Gata… — under environmental review, 150 m away
- Proposed Project of "Gitty/Boulder (Dolostone) Mining Project" located at Gata… — cleared for impact study, 150 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining Project of M/s Shahpur Stone Works… — environmental approval granted, 250 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining Project of M/s Shahpur Stone Works… — returned to applicant, 300 m away
- Proposed Gitti/Boulder (Dolo Stone) Mining project of M/s Shahpur Stone Works… — lapsed, 300 m away
- Billi Markundi, Gitti, Boulder (Dolo Stone) Mining Project (Area 1.50 Ha ) — cleared for impact study, 300 m away
- Billi Markundi Khanda, Boulder (Dolostone) Mining Project — environmental approval granted, 300 m away
- Billi Markundi Khanda, Boulder (Dolostone) Mining Project — cleared for impact study, 300 m away
More from Anil Kumar Nishad in Sonbhadra
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.