Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Feb 2026 |
| Application filed | 7 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vishal Mishra |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Manimau |
| Taluk / tehsil | Kannauj |
| District | Kannauj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03349 |
In context
86 applications in Kannauj since January 2022 are in the same category (Mining): 56 approved, 28 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.5 acres, this one is smaller than 92% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 4.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Manimau, Kannauj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining" Project at Gata No.- 29मि, 32, 34, 35, Village-Manimau,… — initial checks, 200 m away
- "Ordinary Earth Mining" Project at Gata No.- 399, 464, 433, 434, 465, 466,… — environmental approval granted, 600 m away
- "Ordinary Soil Mining" Project at Gata No.- 206, 207, 212मि, 213मि,… — under environmental review, 1.2 km away
- "Ordinary Soil Mining" Project at Gata No.- 65, 125मि, 134, 142, 144, 145,… — environmental approval granted, 1.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 202, 244, 260, 200, 215,… — environmental approval granted, 2.2 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 2.4 km away
- "Ordinary Soil Mining" Project at Gata No-242, 219ग, 226क, 230,… — environmental approval granted, 2.6 km away
- "Ordinary Earth Mining" Project at Gata No.- 226क, Village-Ritukala, Tehsil-… — environmental approval granted, 2.6 km away
More from Vishal Mishra in Kannauj
- "Ordinary Soil Mining" Project at Gata No.- 10, 13मि, 21, 26, 37, Village-… — initial checks
- "Ordinary Soil Mining" Project at Gata No.- 118, 117, 56घ, 112ख,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.