Quick answers
What is this project?
Proposed Project of Building stone Sand Stone Mine at Gata No 732 Sl. No. 44, Area 1.01 ha is an approved mining project in Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Rajesh Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 Jan 2026), as of 27 Nov 2026.
Where is it?
In Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹47 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 3 Dec 2025.
Project details
| Official title | Proposed Project of Building stone Sand Stone Mine at Gata No 732 Sl. No. 44, Area 1.01 ha in Village- Bhagautidei, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 Jan 2026 |
| Application filed | 3 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajesh Patel |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹47 lakh |
| Village / locality | Bhagwatidei |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03374 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Dec 2025 (this page) | Environmental approval granted | 2.5 acres | ₹47 lakh |
| Early planning filed 7 Nov 2023 | Cleared for impact study | 2.5 acres | ₹47 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 30.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 80 mining leases have applied within 5 km.
Where it is
Bhagwatidei, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building stone Sand Stone Mine at Gata No 732 Sl. No. 44,… — cleared for impact study, 0 m away
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 732, Area- 0.809 ha.,… — environmental approval granted, 50 m away
- "Building stone (Sandstone)" Mine at Arazi/Gata No.- 732, Area- 0.809 ha.,… — cleared for impact study, 50 m away
- Proposed Bhagautidei Building Stone (Sandstone) Mining Project — environmental approval granted, 100 m away
- Bhagauti Dei Building stone Sand Stone Mining project — environmental approval granted, 150 m away
- Bhagauti Dei Building stone Sand Stone Mining project — cleared for impact study, 150 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 1 क Sl. No. 18,… — environmental approval granted, 200 m away
- Proposed Project of Building stone Sand Stone Mine at Gata No 1 क Sl. No. 18,… — cleared for impact study, 200 m away
More from Rajesh Patel in Mirzapur
- Proposed Bhagautidei Building Stone (Sandstone) Mining Project At Arazi No… — environmental approval granted
- Proposed Bhagautidei Building Stone (Sandstone) Mining Project At Arazi No… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.