Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 May 2025 |
| Application filed | 22 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Surendra Singh |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹8 lakh |
| Village / locality | Puhuppur |
| Taluk / tehsil | Bakshi Ka Talab |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03409 |
In context
69 applications in Lucknow since January 2022 are in the same category (Mining): 61 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.9 acres, this one is smaller than 67% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Puhuppur, Bakshi Ka Talab, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Soil Mining Project" at Gata No.- 68, 805Ka, 807, 808, 809, 552,… — environmental approval granted, 5.5 km away
- "Ordinary Earth Excavation Project" at Gata No.- 188, Village- Tikri,… — environmental approval granted, 5.8 km away
- Ordinary Soil excavation project — environmental approval granted, 11.8 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 13.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed, 13.7 km away
- Ordinary Soil Mining — environmental approval granted, 14.8 km away
- "Ordinary Earth Mining Project" at Gata No.- 167/4, 168, 170/3mi, 170/4,… — environmental approval granted, 16.4 km away
- Ordinary Earth Excavation/Mining Project — environmental approval granted, 16.6 km away
More from Surendra Singh in Lucknow
- "Ordinary Earth Excavation" at Gata No.- 5 Kha, 31 Ga, Village- Aumau, Tehsil-… — environmental approval granted
- "Ordinary Earth Mining Project" at Gata No.- 167/4, 168, 170/3mi, 170/4,… — environmental approval granted
- "Ordinary Soil Mining Project" — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.