Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 May 2025 |
| Application filed | 22 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Atul Kumar |
| Land area | 1.6 acres (0.7 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Tira Rabbu |
| Taluk / tehsil | Chhibramau |
| District | Kannauj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03449 |
In context
86 applications in Kannauj since January 2022 are in the same category (Mining): 56 approved, 28 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.6 acres, this one is smaller than 86% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Tira Rabbu, Chhibramau, Kannauj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Forest Land Proposed to be diverted for Construction of Canal Passing0.771km… — more information requested, 4.8 km away
- Proposed Reserve Forest Land in Baniyani Forest Block, Social Forestry… — forest land use approved, 5.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 127, Village- Kakraha, Tehsil-… — under environmental review, 6.2 km away
- "Ordinary Soil Mining" Project at Gata No.- 244मि, 273मि, 282/13, 282/18,… — environmental approval granted, 6.4 km away
- Ordinary Soil Mining" Project at Gata No.- 153, 154/2, 160,… — environmental approval granted, 7 km away
- Ordinary Soil Mining" Project at Gata No.- 153, 154/2, 160,… — initial checks, 7 km away
- "Ordinary Soil Mining" Project at Gata No.- 165, Village- Singhnapur, Tehsil-… — initial checks, 7 km away
- "Ordinary Soil Mining" Project at Gata No.- 209/5, 209/9, 209/10, 225, 244मि,… — under environmental review, 7.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.