LapsedWater & irrigation · Sonbhadra, Uttar Pradesh

Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six Limited

Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six Limited is a lapsed water and irrigation project in Markuri, Robertsganj, Sonbhadra, Uttar Pradesh. The site covers 8,459.5 acres. Its stated project cost is ₹11,278.6 crore. As of 27 Nov 2026, its status is “Lapsed” (since 28 Jun 2026).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Kandhaura Pumped Storage Project (1680 MW) by M/s. JSW Energy PSP Six Limited

Project details

Official titleProposed Kandhaura Pumped Storage Project (1680 MW) at Village: Sashnai, Taluka: Obra and Villages: Markuri & Cherue Taluka: Robertsganj, District: Sonbhadra, Uttar Pradesh by M/s. JSW Energy PSP Six Limited.
StatusLapsed
Status since28 Jun 2026
Application filed16 Jul 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorWater & irrigation
ApplicantJsw Energy Psp Six Limited
Land area8,459.5 acres (3,423.5 ha)
Project cost₹11,278.6 crore
Village / localityMarkuri
Taluk / tehsilRobertsganj
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03547

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Aug 2026Under forest review8,459.5 acres₹11,278.6 crore
New project filed 16 Jul 2025 (this page)Lapsed8,459.5 acres₹11,278.6 crore
Early planning filed 27 Nov 2023Cleared for impact study8,459.5 acres₹11,278.6 crore

In context

28 applications in Sonbhadra since January 2022 are in the same category (Water & irrigation): 14 approved, 7 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8,459.5 acres, this one is larger than 89% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Markuri, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jsw Energy Psp Six Limited in Sonbhadra

All 6 Jsw Energy Psp Six projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.