What is this project?
"Ordinary Earth Mining" Project at Gata No.- 371, Village- Budh Nagla Hemraj, Tehsil- Hathras, District- Hathras, Uttar Pradesh. (Area-1.7650 Ha). Shri Jay Sharma is an approved mining project in Budh Nagla Hemraj, Hathras, Uttar Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Jay Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 Mar 2026), as of 27 Nov 2026.
Where is it?
In Budh Nagla Hemraj, Hathras, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 6 Dec 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Mar 2026 |
| Application filed | 6 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jay Sharma |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Budh Nagla Hemraj |
| Taluk / tehsil | Hathras |
| District | Hathras |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03565 |
In context
47 applications in Hathras since January 2022 are in the same category (Mining): 32 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.4 acres, this one is larger than 85% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Budh Nagla Hemraj, Hathras, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Earth Mining" Project at Gata No.- 11, Village- Bad Nagla Athwaria,… — environmental approval granted, 200 m away
- "Ordinary Soil Mining" Project at Gata No.- 22, 23, V-Bad Nagla Athwaria,… — environmental approval granted, 500 m away
- The Diversion of Road Side Protected Forest Land for the Construction of… — forest land use approved, 2 km away
- Roposal for the Diversion of Road Side Protected Forest Land(0.03361 Hac.) on… — lapsed, 2.8 km away
- Ordinary Earth Mining" Project at Gata No.- 72, Village- Sangila Nagla Bari,… — environmental approval granted, 3.2 km away
- "Ordinary Earth Mining" Project at Gata No.- 145, 147, Village- Ahbaranpur,… — environmental approval granted, 3.2 km away
- Environment Clearance for proposed district jail complex at Hathras, Village-… — environmental approval granted, 3.5 km away
- Proposed "Ordinary Soil Excavation" Project at Area: 0.755 Ha. Gata No.– 483 — environmental approval granted, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.