What is Developing? Open the mapMap

Environmental approval grantedMining · Unnao, Uttar Pradesh

Proposed "Soil Excavation Project" at Gata No. – 92,135,139,120,121,122 & 172 (Total area 1.9903 Ha.)

Proposed "Soil Excavation Project" at Gata No. – 92,135,139,120,121,122 & 172 (Total area 1.9903 Ha.) is an approved mining project in Dewara Khurd, Unnao, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹40 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 23 May 2025).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed "Soil Excavation Project" at Gata No. – 92,135,139,120,121,122 & 172 (Total area 1.9903 Ha.) is an approved mining project in Dewara Khurd, Unnao, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Chandra Pal.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 23 May 2025), as of 27 Nov 2026.

Where is it?

In Dewara Khurd, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹40 lakh and a site of 2.5 acres.

When was it filed?

The application was filed on 19 Mar 2025.

Project details

Official titleproposed "Soil Excavation Project" at Gata No. – 92,135,139,120,121,122 & 172 (Total area 1.9903 Ha.) located in village – Devara Khurd, Tehsil – Unnao & District - Unnao, Uttar Pradesh.M/s Chandra & Associates Proponent – Shri Chandra Pal (Total area 1.9903 Ha.).
StatusEnvironmental approval granted
Status since23 May 2025
Application filed19 Mar 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantChandra Pal
Land area2.5 acres (1 ha)
Project cost₹40 lakh
Village / localityDewara Khurd
Taluk / tehsilUnnao
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03574

In context

72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 55% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 11.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.

Where it is

Dewara Khurd, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chandra Pal in Unnao

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.