What is Developing? Open the mapMap

Environmental approval grantedMining · Kannauj, Uttar Pradesh

"Ordinary Soil Mining" Project at Gata No.- 551/812, Village-Gulriyapur, Tehsil- Chhibramau, District-Kannauj, U.P. (Area – 0.7930 ha). Shri Rameshvar Dayal

"Ordinary Soil Mining" Project at Gata No.- 551/812, Village-Gulriyapur, Tehsil- Chhibramau, District-Kannauj, U.P. (Area – 0.7930 ha). Shri Rameshvar Dayal is an approved mining project in Gurauli, Tirwa, Kannauj, Uttar Pradesh. The site covers 2 acres. Its stated project cost is ₹13 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 30 May 2026).

See it on the live map All projects in Kannauj

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusEnvironmental approval granted
Status since30 May 2026
Application filed4 Oct 2025
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRameshvar Dayal
Land area2 acres (0.8 ha)
Project cost₹13 lakh
Village / localityGurauli
Taluk / tehsilTirwa
DistrictKannauj
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03602

In context

86 applications in Kannauj since January 2022 are in the same category (Mining): 56 approved, 28 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2 acres, this one is smaller than 72% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Gurauli, Tirwa, Kannauj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.