Quick answers
What is this project?
Proposed Project of Building stone Sand Stone Mine of Smt Vibha Devi at Gata no. 299, 300, 301, 302ka, 266kha, 265ka, 266ka, Area 3.620 ha is a proposed mining project in Baluwa Bajahur, Chunar, Mirzapur, Uttar Pradesh. The site covers 8.9 acres.
Who is building it?
The applicant is Vibha Devi.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 25 Feb 2026), as of 27 Nov 2026.
Where is it?
In Baluwa Bajahur, Chunar, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 8.9 acres.
When was it filed?
The application was filed on 31 May 2025.
Project details
| Official title | Proposed Project of Building stone Sand Stone Mine of Smt Vibha Devi at Gata no. 299, 300, 301, 302ka, 266kha, 265ka, 266ka, Area 3.620 ha in Village- Balua Bajahur, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh. |
|---|---|
| Status | Cleared for impact study |
| Status since | 25 Feb 2026 |
| Application filed | 31 May 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vibha Devi |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Baluwa Bajahur |
| Taluk / tehsil | Chunar |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03626 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 Oct 2026 | Under environmental review | 8.9 acres | ₹70 lakh |
| Early planning filed 31 May 2025 (this page) | Cleared for impact study | 8.9 acres | ₹70 lakh |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.9 acres, this one is larger than 89% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 6 mining leases have applied within 5 km.
Where it is
Baluwa Bajahur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of Building stone Sand Stone Mine of Smt Vibha Devi at Gata… — under environmental review, 0 m away
- Building stone (Sandstone)" mine at Gata No.- 303mi, Area 1.25 Ha., Village–… — environmental approval granted, 200 m away
- "Building stone (Sandstone)" Mine at Gata/Arazi No- 258, Area – 0.7 ha.,… — environmental approval granted, 500 m away
- "Building Stone (Sandstone)" mine — environmental approval granted, 1.9 km away
- "Building Stone Sand Stone" Project at Gata No.- 531 Ga, 531 Gha, Village-… — environmental approval granted, 2.3 km away
- "Building Stone Sand Stone" Project at Gata No.- 531 Ga, 531 Gha, Village-… — cleared for impact study, 2.3 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — environmental approval granted, 2.5 km away
- Rampur Saktegarh Building stone Sand Stone Mining project — cleared for impact study, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.