Quick answers
What is this project?
"Ordinary Soil Mining Project" at Gata No. – 576मि, 598, 599, 607, 608, 609, 610, 615मि, Village- Khalilpur Kadim, Tehsil- Kanth, District- Moradabad of State- Uttar Pradesh, Area– 1.4397 ha by Shri Rupak Kumar is an approved mining project in Khalilpur Kadim, Kanth, Amroha, Uttar Pradesh. The site covers 3.6 acres.
Who is building it?
The applicant is Rupak Kumar.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 10 Mar 2026), as of 27 Nov 2026.
Where is it?
In Khalilpur Kadim, Kanth, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5 lakh and a site of 3.6 acres.
When was it filed?
The application was filed on 30 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 10 Mar 2026 |
| Application filed | 30 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rupak Kumar |
| Land area | 3.6 acres (1.4 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Khalilpur Kadim |
| Taluk / tehsil | Kanth |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03646 |
In context
38 applications in Amroha since January 2022 are in the same category (Mining): 27 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3.6 acres, this one is smaller than 63% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 13.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 15 mining leases have applied within 5 km.
Where it is
Khalilpur Kadim, Kanth, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Excavation" Project at Area: 2.197 Ha. "Ordinary Soil… — more information requested, 50 m away
- Khaleelpur Kadeem Soil Mining Project — under environmental review, 400 m away
- Area: 0.844 Ha. "Ordinary Soil Excavation" Project at Gata No.– 656मि, 710मि,… — environmental approval granted, 550 m away
- Ordinary Earth Mine, Village- Khalilpur Kadim, Tehsil- Kanth, District-… — environmental approval granted, 650 m away
- Khaleelpur Soil Mining Project — environmental approval granted, 900 m away
- Badaudi fatehullapur Soil Mining Project — environmental approval granted, 1 km away
- Badaudi Fatehullapur Soil Mining Project — environmental approval granted, 1 km away
- Badaudi Soil Mining Project — under environmental review, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.