Quick answers
What is this project?
"Building Stone or Khanda, Gitti, Boulder, Ballast, Mining Project" is a proposed mining project in Goramachhiya, Jhansi, Uttar Pradesh. The site covers 6.4 acres.
Who is building it?
The applicant is Ghanaram Infraengineers Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 27 Oct 2025), as of 27 Nov 2026.
Where is it?
In Goramachhiya, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 6.4 acres.
When was it filed?
The application was filed on 27 Oct 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 27 Oct 2025 |
| Application filed | 27 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ghanaram Infraengineers Private Limited |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Goramachhiya |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03708 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 6.4 acres, this one is larger than 61% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 18 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 23 mining leases have applied within 5 km.
Where it is
Goramachhiya, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone (Khanda, Gitti, Boulder) Mining Project — lapsed, 100 m away
- "Building Stone (Khanda, Boulder, Ballast) Mining Project" at Arazi No.-… — under environmental review, 200 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — environmental approval granted, 200 m away
- Building Stone (Granite), Khanda-Boulder/ Gitti- Ballast Mining Project — cleared for impact study, 200 m away
- "Building Stone As (Khanda, Boulder, Ballast) over an area of 1.416 ha in Gata… — cleared for impact study, 250 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — more information requested, 300 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — cleared for impact study, 300 m away
- Building Stone or Khanda, Gitti, Boulder, Mining Project — lapsed, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.