Quick answers
What is this project?
Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total area 34.0000 Ha.) is a proposed mining project in Rasoolpur Urf Rasooli, Behat, Saharanpur, Uttar Pradesh. The site covers 84 acres.
Who is building it?
The applicant is Rajesh Rexwal Verma.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 24 Dec 2025), as of 27 Nov 2026.
Where is it?
In Rasoolpur Urf Rasooli, Behat, Saharanpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh and a site of 84 acres.
When was it filed?
The application was filed on 11 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total area…
Project details
| Official title | proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total area 34.0000 Ha.) located in village – Rasoolpur Urf Rasooli, Tehsil – Behat & District - Saharanpur, Uttar Pradesh,M/s Deepak Mines Authorized Partner-Rajesh Rexwal Verma,Total area 34.0000 Ha.. |
|---|---|
| Status | Cleared for impact study |
| Status since | 24 Dec 2025 |
| Application filed | 11 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Rajesh Rexwal Verma |
| Land area | 84 acres (34 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Rasoolpur Urf Rasooli |
| Taluk / tehsil | Behat |
| District | Saharanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03728 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Mar 2026 | Environmental approval granted | 84 acres | ₹90 lakh |
| Early planning filed 11 Sept 2025 (this page) | Cleared for impact study | 84 acres | ₹90 lakh |
In context
43 applications in Saharanpur since January 2022 are in the same category (Mining): 34 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 84 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Rasoolpur Urf Rasooli, Behat, Saharanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Sand/Bajri/Boulder (RBM) Mining Project" at Gata No. – 1/1, (Total… — environmental approval granted, 0 m away
- Proposed "Sand/ Bajri/ Boulder RBM Excavation Project" at Gata No.– 1/1M,… — environmental approval granted, 1.7 km away
- Proposed "Sand/ Bajri/ Boulder RBM Excavation Project" at Gata No.– 1/1M,… — cleared for impact study, 1.7 km away
- Sand/Morrum/Bajri Excavation Project — cleared for impact study, 1.9 km away
- Sand/Morrum/Bajri Excavation Project — environmental approval granted, 1.9 km away
- Proposed "Sand/ Bajri/ Boulder(RBM) Excavation Project" at Gata No. – 1/1 /1,… — environmental approval granted, 2.6 km away
- Proposed "Sand/ Bajri/ Boulder(RBM) Excavation Project" at Gata No. – 1/1 /1,… — cleared for impact study, 2.6 km away
- Proposed "Sand/ Bajri/ Boulder Excavation Project" at Gata No. – 1/1 M, (Total… — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.