Project details
| Official title | Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata no- 21/13 (Lease Area 1.250 Ha) in Village- Sukrit, Tehsil Robertsganj & District- Sonbhadra, Uttar Pradesh, M/S J.P ENTERPRISES Prop. – Shri Jai Prakash Singh,Lease Area 1.250 Ha. |
|---|---|
| Status | Cleared for impact study |
| Status since | 31 Dec 2025 |
| Application filed | 12 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Jai Prakash Singh |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Sukrit |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03735 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 21 May 2026 | Lapsed | 3.1 acres | ₹98 lakh |
| Early planning filed 12 Sept 2025 (this page) | Cleared for impact study | 3.1 acres | ₹98 lakh |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.1 acres, this one is smaller than 70% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 11.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata… — lapsed, 0 m away
- Proposed Project of Gitti / Boulder (Sand Stone) Mining Project of M/s A.A.… — under environmental review, 150 m away
- Proposed Project of Gitti / Boulder (Sand Stone) Mining Project of M/s A.A.… — cleared for impact study, 150 m away
- Proposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s Abhishek… — environmental approval granted, 250 m away
- Proposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s Abhishek… — cleared for impact study, 250 m away
- Proposed "Gitti / Boulders (Sand Stone)" Project at Gata No.- 21/ 23/ 1, 21/… — under environmental review, 400 m away
- Area- 3.5127 Ha Gitti-Boulder (Sandstone) Mining Project Araji no. 30/49,… — environmental approval granted, 550 m away
- Area- 3.5127 Ha Gitti-Boulder (Sandstone) Mining Project Araji no. 30/49,… — cleared for impact study, 550 m away