Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ghaghra River?
"Ordinary Sand Mining" from Riverbed of Ghaghra River is an approved mining project in Girgitti, Nanpara, Bahraich, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Vineet Dixit.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Jun 2025), as of 27 Nov 2026.
Where is it?
In Girgitti, Nanpara, Bahraich, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 3 acres.
When was it filed?
The application was filed on 17 Apr 2025.
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ghaghra River at Village- Girgitti, Gata No.- 592 Mi, Lease Area- 1.2100 Ha., Tehsil– Mihinpurwa (Motipur), District– Bahraich, Uttar Pradesh, Project Proponent- Shri Vineet Dixit |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Jun 2025 |
| Application filed | 17 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vineet Dixit |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Girgitti |
| Taluk / tehsil | Nanpara |
| District | Bahraich |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03782 |
In context
20 applications in Bahraich since January 2022 are in the same category (Mining): 18 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3 acres, this one is larger than 65% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 5.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Girgitti, Nanpara, Bahraich, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining (Category-I)" from Riverbed of Ghaghra River — environmental approval granted, 350 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 6 km away
- Khamariya-Mihinpurwa, Mihinpurwa-Nanpara & Nanpara-Bahraich OFC Patch Work — lapsed, 10.6 km away
- Project for Laying of Optical Fibre Cable (OFC) — more information requested, 13.4 km away
- Project for Laying of Optical Fibre Cable (OFC) — more information requested, 13.4 km away
- Proposed Forest Land to be diverted for Proposed Road — more information requested, 14.8 km away
- Proposed Forest Land to be diverted for Proposed Road — lapsed, 14.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to HPCL… — forest land use approved, 17.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.