One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed project of Gitti/Boulder, Dolo Stone Mining project at Arazi No. – 353क, 362,…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Dec 2025 |
| Application filed | 4 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Amarnath |
| Land area | 5.4 acres (2.2 ha) |
| Project cost | ₹2.6 crore |
| Village / locality | Kharaitiya |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03848 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Apr 2026 | Environmental approval granted | 5.4 acres | ₹2.6 crore |
| Early planning filed 4 Sept 2025 (this page) | Cleared for impact study | 5.4 acres | ₹2.6 crore |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.4 acres, this one is larger than 62% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 52 mining leases have applied within 5 km.
Where it is
Kharaitiya, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed project of Gitti/Boulder, Dolo Stone Mining project at Arazi No. –… — environmental approval granted, 0 m away
- Proposed Gitti/Boulder, Dolo Stone Mining project at Arazi No. – 362, 366,… — lapsed, 150 m away
- Environmental clearance of proposed Khanda /Boulder (Dolo stone) mine from… — environmental approval granted, 500 m away
- Submission of Form-1, Pre Feasibility Report (PFR), EMP, and Approved Mining… — environmental approval granted, 1.6 km away
- Submission of Form-1, Pre Feasibility Report (PFR), EMP, and Approved Mining… — lapsed, 1.6 km away
- Bardiya Gitti, Boulder, (Dolo Stone) Mining Project — lapsed, 1.7 km away
- Bardiya Gitti Boulder, (Dolo Stone) Mining Project (Area 0.8097 Ha or 2.00… — environmental approval granted, 1.7 km away
- Gitti/ Boulder (Dolostone) at Gata No.- 7364Ga/1, 7367, 7368, 7369, 7371Ka,… — lapsed, 1.9 km away
More from Amarnath in Sonbhadra
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.