What is Developing? Open the mapMap

Under environmental reviewMining · Unnao, Uttar Pradesh

Ordinary Soil Excavation project at Gata No. –813, Village: Rajepur, Tehsil: Unnao, District-Unnao, Uttar Pradesh, area 0.9936 ha, by Shri Vishwas Pratap Singh S/o Shri Shiv Harsh Singh

Ordinary Soil Excavation project at Gata No. –813, Village: Rajepur, Tehsil: Unnao, District-Unnao, Uttar Pradesh, area 0.9936 ha, by Shri Vishwas Pratap Singh S/o Shri Shiv Harsh Singh is a proposed mining project in Rajepur, Unnao, Uttar Pradesh. The site covers 2.4 acres. Its stated project cost is ₹5 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 25 Nov 2026).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Ordinary Soil Excavation project at Gata No. –813, Village: Rajepur, Tehsil: Unnao, District-Unnao, Uttar Pradesh, area 0.9936 ha, by Shri Vishwas Pratap Singh S/o Shri Shiv Harsh Singh is a proposed mining project in Rajepur, Unnao, Uttar Pradesh. The site covers 2.4 acres.

Who is building it?

The applicant is Vishvas Pratap Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Rajepur, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹5 lakh and a site of 2.4 acres.

When was it filed?

The application was filed on 4 Aug 2026.

Project details

StatusUnder environmental review
Status since25 Nov 2026
Application filed4 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantVishvas Pratap Singh
Land area2.4 acres (1 ha)
Project cost₹5 lakh
Village / localityRajepur
Taluk / tehsilUnnao
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-03887

In context

72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.4 acres, this one is smaller than 58% of them.

No other mining lease on record is within 500 m of this site; 12 have applied within 5 km.

Where it is

Rajepur, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vishvas Pratap Singh in Unnao

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.