Project details
| Official title | Proposed expansion of Sugar unit from 13000 TCD to 15000 TCD without change in co gen power 26.5 MW at Village- Muradnagar, Surjipara, Deeppur & Jahangirabad Pargana- Hargaon, Tehsil & District- Sitapur, Uttar Pradesh by M/s Avadh Sugar & Energy Limited, Unit Hargaon |
|---|---|
| Status | Environmental approval granted |
| Status since | 4 Jun 2026 |
| Application filed | 11 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Avadh Sugar & Energy Limited |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹164.1 crore |
| Village / locality | Dippur |
| Taluk / tehsil | Sitapur |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03888 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 11 Feb 2026 (this page) | Environmental approval granted | 39.6 acres | ₹164.1 crore |
| Early planning filed 24 Jul 2024 | Cleared for impact study | 39.6 acres | ₹164.1 crore |
In context
12 applications in Sitapur since January 2022 are in the same category (Industry): 9 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 39.6 acres, this one is larger than 67% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dippur, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Sugar unit from 13000 TCD to 15000 TCD without change in… — cleared for impact study, 0 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 4.2 km away
- Diversion of Protected Forest Land To Be Diverted For Entry And Exit To… — in-principle approval, conditions pending, 4.5 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 4.9 km away
- Sitapur state- Uttar Pradesh — lapsed, 10 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — in-principle approval, conditions pending, 10.4 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — more information requested, 10.6 km away
All 7 Avadh Sugar & Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.