Quick answers
What is this project?
Proposed Group Housing namely "Jaimahal", Kasba Koil -2, Near Sarai Harnarayan Paragana, Tehsil Koil, District Aligarh, Uttar Pradesh is a proposed building project in Aligarh (Municpal Area), Koil, Aligarh, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Shekhar Infracon Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Aligarh (Municpal Area), Koil, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 crore and a site of 0.9 acres.
When was it filed?
The application was filed on 22 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 22 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shekhar Infracon Private Limited |
| Land area | 3,700 m² |
| Project cost | ₹86 crore |
| Village / locality | Aligarh (Municpal Area) |
| Taluk / tehsil | Koil |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-03914 |
In context
11 applications in Aligarh since January 2022 are in the same category (Buildings & townships): 4 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 0.9 acres, this one is smaller than 91% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aligarh (Municpal Area), Koil, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of protected forest land for Construction of 640.61 m long Four-lane… — forest land use approved, 2.7 km away
- Diversion of 0.0381564 Hectare of Protected Forest Land Under Social Foresty… — forest land use approved, 4.1 km away
- Diversion of Protected Forest Land for construction of approach road to the… — forest land use approved, 4.1 km away
- Diversion of Protected Forest Land for Rehabilitation and up-gradation to… — lapsed, 4.3 km away
- UP Defence Industrial Corridor – Aligarh Node (Phase- II) — cleared for impact study, 4.6 km away
- Proposed Commercial Building & Bus Stand of Uttar Pradesh Parivahan Nigam at… — more information requested, 4.9 km away
- Soil Excavation Mine — environmental approval granted, 5.7 km away
- Proposed Protected Forest Land to Be Diverted by Hindustan Petroleum… — lapsed, 6.1 km away
About this information