Project details
| Official title | Proposed building stone (Gitti, Boulder, Khanda) sand stone mine at bhukhand No.- 3Ga Mi, khand No.–07, Area 3.00 ha at village – Garha, Tehsil- Bara, District- Prayagraj, Uttar Pradesh of M/s Quality Quarries Pvt. Ltd, Prop: Shri Yasir Ausaf. |
|---|---|
| Status | Environmental approval granted |
| Status since | 20 Nov 2026 |
| Application filed | 5 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Quality Quarries Private Limited |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹90 lakh |
| Village / locality | Garha |
| Taluk / tehsil | Bara |
| District | Prayagraj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04038 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Sept 2026 (this page) | Environmental approval granted | 7.4 acres | ₹90 lakh |
| Early planning filed 3 Jun 2025 | Cleared for impact study | 7.4 acres | ₹90 lakh |
In context
155 applications in Prayagraj since January 2022 are in the same category (Mining): 89 approved, 43 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 7.4 acres, this one is smaller than 74% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 16.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Garha, Bara, Prayagraj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed building stone (Gitti, Boulder, Khanda) sand stone mine at bhukhand… — cleared for impact study, 0 m away
- Proposed building stone (Gitti, Boulder, Khanda) sand stone mine at bhukhand… — under environmental review, 150 m away
- "Sand Stone (Gitti- Patthar, Boulder)" Project at Gata No.- 03 (Khand No.- 09)… — environmental approval granted, 250 m away
- Proposed increase in Cement production capacity from 2.5 Million TPA to 3.0… — initial checks, 2 km away
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — environmental approval granted, 2 km away
- Proposed Standalone Clinker Grinding Unit with Cement Production Capacity of… — environmental approval granted, 2 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — initial checks, 2.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to private… — lapsed, 2.3 km away