Initial checksMining · Mirzapur, Uttar Pradesh

Area- 1.01 Ha Building Stone(Sandstone)Gitti. Boulder PatiyaMining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh.

Area- 1.01 Ha Building Stone(Sandstone)Gitti. Boulder PatiyaMining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Initial checks” (since 4 Nov 2026).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Area- 1.01 Ha Building Stone(Sandstone)Gitti. Boulder PatiyaMining Project Araji no. 428, Village-Dhuriya, Tehsil-Chunar, District-Mirzapur, Uttar Pradesh is a proposed mining project in Dhuria, Chunar, Mirzapur, Uttar Pradesh. The site covers 2.5 acres.

Who is building it?

The applicant is Ras Singh.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Dhuria, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.7 crore and a site of 2.5 acres.

When was it filed?

The application was filed on 23 Oct 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Area- 1.01 Ha Building Stone(Sandstone)Gitti. Boulder PatiyaMining Project Araji no.…

Project details

StatusInitial checks
Status since4 Nov 2026
Application filed23 Oct 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRas Singh
Land area2.5 acres (1 ha)
Project cost₹1.7 crore
Village / localityDhuria
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04064

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 23 Oct 2026 (this page)Initial checks2.5 acres₹1.7 crore
Early planning filed 10 Oct 2024Cleared for impact study2.5 acres₹1.7 crore

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 75% of them.

15 other mining leases have applied within 500 m of this site; together with this one they cover 58 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 66 mining leases have applied within 5 km.

Where it is

Dhuria, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ras Singh in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.