What is Developing? Open the mapMap

Environmental approval grantedMining · Unnao, Uttar Pradesh

"Ordinary Soil Excavation Project" at Gata No.- 671, 672, 703, Village- Asawar, Tehsil- Purwa, District- Unnao of State- Uttar Pradesh over an area of 1.8460 ha., by M/s Gupta Construction, Authorized, Shri Vinay Kumar Gupta

"Ordinary Soil Excavation Project" at Gata No.- 671, 672, 703, Village- Asawar, Tehsil- Purwa, District- Unnao of State- Uttar Pradesh over an area of 1.8460 ha., by M/s Gupta Construction, Authorized, Shri Vinay Kumar Gupta is an approved mining project in Asawar, Purwa, Unnao, Uttar Pradesh. The site covers 4.6 acres. Its stated project cost is ₹6 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 9 May 2026).

See it on the live map All projects in Unnao

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

"Ordinary Soil Excavation Project" at Gata No.- 671, 672, 703, Village- Asawar, Tehsil- Purwa, District- Unnao of State- Uttar Pradesh over an area of 1.8460 ha., by M/s Gupta Construction, Authorized, Shri Vinay Kumar Gupta is an approved mining project in Asawar, Purwa, Unnao, Uttar Pradesh. The site covers 4.6 acres.

Who is building it?

The applicant is Vinay Kumar Gupta.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 9 May 2026), as of 27 Nov 2026.

Where is it?

In Asawar, Purwa, Unnao, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6 lakh and a site of 4.6 acres.

When was it filed?

The application was filed on 6 Feb 2026.

Project details

StatusEnvironmental approval granted
Status since9 May 2026
Application filed6 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantVinay Kumar Gupta
Land area4.6 acres (1.9 ha)
Project cost₹6 lakh
Village / localityAsawar
Taluk / tehsilPurwa
DistrictUnnao
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04067

In context

72 applications in Unnao since January 2022 are in the same category (Mining): 49 approved, 21 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.6 acres, this one is larger than 83% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Asawar, Purwa, Unnao, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vinay Kumar Gupta in Unnao

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.