What is Developing? Open the mapMap

Under environmental reviewMining · Sonbhadra, Uttar Pradesh

Proposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s A.A. Stone, Partner- Shri Ranglal Maurya at Gata No. 30/45, 30/46mi, 30/65mi, 30/45mi, Area- 1.9700 ha

Proposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s A.A. Stone, Partner- Shri Ranglal Maurya at Gata No. 30/45, 30/46mi, 30/65mi, 30/45mi, Area- 1.9700 ha is a proposed mining project in Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The site covers 4.9 acres. Its stated project cost is ₹75 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 15 Oct 2026).

See it on the live map All projects in Sonbhadra

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s A.A. Stone,…

Project details

Official titleProposed Project of Gitti/Boulder (Sand Stone) Mining Project of M/s A.A. Stone, Partner- Shri Ranglal Maurya at Gata No. 30/45, 30/46mi, 30/65mi, 30/45mi, Area- 1.9700 ha in Village- Sukrut, Tehsil- Robertsganj, District- Sonbhadra, Uttar Pradesh
StatusUnder environmental review
Status since15 Oct 2026
Application filed18 May 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantRanglal Maurya
Land area4.9 acres (2 ha)
Project cost₹75 lakh
Village / localitySukrit
Taluk / tehsilRobertsganj
DistrictSonbhadra
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04106

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 18 May 2026 (this page)Under environmental review4.9 acres₹75 lakh
Early planning filed 6 Oct 2025Cleared for impact study4.9 acres₹75 lakh

In context

209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is larger than 55% of them.

7 other mining leases have applied within 500 m of this site; together with this one they cover 29 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.

Where it is

Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ranglal Maurya in Sonbhadra

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.