What is Developing? Open the mapMap

Under environmental reviewMining · Mirzapur, Uttar Pradesh

Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining project of Gata No. – 997 Mi. Village – Sindhora, Tehsil – Sadar District – Mirzapur, Uttar Pradesh in favour of M/s Vindhya Construction

Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining project of Gata No. – 997 Mi. Village – Sindhora, Tehsil – Sadar District – Mirzapur, Uttar Pradesh in favour of M/s Vindhya Construction is a proposed mining project in Sindhaura, Mirzapur, Uttar Pradesh. The site covers 11 acres. Its stated project cost is ₹95 lakh. As of 27 Nov 2026, its status is “Under environmental review” (since 30 Oct 2026).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Building Stone, Sandstone, Quartzite, Ballast & Gitti Mining project of Gata No. – 997 Mi. Village – Sindhora, Tehsil – Sadar District – Mirzapur, Uttar Pradesh in favour of M/s Vindhya Construction is a proposed mining project in Sindhaura, Mirzapur, Uttar Pradesh. The site covers 11 acres.

Who is building it?

The applicant is Vindhya Pratap singh.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Sindhaura, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹95 lakh and a site of 11 acres.

When was it filed?

The application was filed on 7 Oct 2026.

Project details

StatusUnder environmental review
Status since30 Oct 2026
Application filed7 Oct 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantVindhya Pratap singh
Land area11 acres (4.5 ha)
Project cost₹95 lakh
Village / localitySindhaura
Taluk / tehsilMirzapur
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04158

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 11 acres, this one is larger than 93% of them.

10 other mining leases have applied within 500 m of this site; together with this one they cover 82.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Sindhaura, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Vindhya Pratap singh in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.