Project details
| Official title | Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata no- 281/31 (Lease Area 1.2650 Ha) in Village- Sukrit, Tehsil Robertsganj & District- Sonbhadra, Uttar Pradesh,M/s Ramashankar Dubey Prop – Shri Ramashankar Dubey,Area 1.2650 Ha. |
|---|---|
| Status | Environmental approval granted |
| Status since | 25 Jul 2026 |
| Application filed | 19 May 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rama Dubey |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Sukrit |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04200 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 May 2026 (this page) | Environmental approval granted | 3.1 acres | ₹98 lakh |
| Early planning filed 18 Jun 2025 | Cleared for impact study | 3.1 acres | ₹98 lakh |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.1 acres, this one is smaller than 67% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 44.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 29 mining leases have applied within 5 km.
Where it is
Sukrit, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of "Gitty/Boulder (Sandstone) Mining Project" located at Gata… — cleared for impact study, 0 m away
- Building Stone Gitti/Boulder (Sand Stone) located at Arazi No. 282Mi,… — environmental approval granted, 150 m away
- Area 1.0926 Building Stone Gitti/ Boulder(Sandstone) Mining Project — cleared for impact study, 150 m away
- Area 1.0926 Building Stone Gitti/ Boulder(Sandstone) Mining Project — environmental approval granted, 150 m away
- Sukrit Sandstone (Quartizite Ballast Gitti) Mining Project (Area 2.0234 Ha) — under environmental review, 200 m away
- Sukrit Sandstone (Quartizite Ballast Gitti) Mining Project (Area 2.0234 Ha) — cleared for impact study, 200 m away
- Proposed Building Stone (Gitti/Boulder) Sand Stone Mine, Araji number-281/40,… — cleared for impact study, 200 m away
- Proposed Building Stone (Gitti/Boulder) Sand Stone Mine, Araji number-281/40,… — environmental approval granted, 200 m away