| Official title | Proposed Installation of Integrated Solar Cell and Solar Module Manufacturing Unit by M/s. SAEL Solar P6 Private Limited (SSPPL) located at Plot No. 1, Sector 8, Village – Dastampur, Tehsil – Jewar, District – Gautam Buddha Nagar, State – Uttar Pradesh, India – 203155. |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jun 2026 |
| Application filed | 20 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | SAEL Solar P6 Private limited |
| Use | Industrial |
| Land area | 198.1 acres (80.2 ha) |
| Built-up area | 5,91,844 m² (63,70,550 sq ft) |
| Plot area | 8,01,644 m² (86,28,816 sq ft) |
| Project cost | ₹8,253 crore |
| Village / locality | Dastampur |
| Taluk / tehsil | Jewar |
| District | Gautam Buddha Nagar (Noida) |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04216 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Mar 2026 (this page) | Environmental approval granted | 198.1 acres | ₹8,253 crore |
| Early planning filed 10 Dec 2025 | Cleared for impact study | 198.1 acres | ₹8,253 crore |
In context
430 applications in Noida since January 2022 are in the same category (Buildings & townships): 306 approved, 90 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 198.1 acres, this one is larger than 95% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dastampur, Jewar, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Solar Cell and Solar Module Manufacturing Unit by M/s. SAEL Solar… — cleared for impact study, 0 m away
- 3 GW Solar Cell Manufacturing Unit at Plot No. 4, Sector 8D, Jewar, Gautam… — environmental approval granted, 3.5 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — forest land use approved, 3.6 km away
- Proposed "Tractor, Engine, Transmission & Parts Manufacturing Industrial Unit"… — initial checks, 4.4 km away
- Greenfield Jewar International Airport Phase-I & II, Gautam Buddh Nagar, Uttar… — environmental approval granted, 4.5 km away
- Manufacturing of Electrical & Electronics Item at Plot No. 1460B, Sector 32,… — environmental approval granted, 5.2 km away
- Proposed Fragrance & Flavour Facility at Plot no. 1459 B, Sector 32, YEIDA — returned to applicant, 5.4 km away
- Proposed Fragrance & Flavour Facility at Plot no. 1459 B, Sector 32, YEIDA — withdrawn, 5.4 km away
All 3 SAEL Solar P6 projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.