Project details
| Status | Initial checks |
|---|---|
| Status since | 10 Oct 2026 |
| Application filed | 30 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Atul Mishra |
| Land area | 4.5 acres (1.8 ha) |
| Project cost | ₹308.5 crore |
| Village / locality | Kaliakhera |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04226 |
In context
160 applications in Lucknow since January 2022 are in the same category (Buildings & townships): 105 approved, 38 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.5 acres, this one is larger than 50% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaliakhera, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Township and Area Development Under Mohan Road Scheme — environmental approval granted, 550 m away
- Township and Area Development Under Mohan Road Scheme — cleared for impact study, 550 m away
- Mohaan Road Yojna 60 Meter Road — lapsed, 1.8 km away
- Mohan Road Yojna — not approved, 2 km away
- Environmental clearance for the proposed "AERO CITY" located at Khasra No,… — withdrawn, 2.2 km away
- Forest Land Proposed for Construction of approach road — under forest review, 2.3 km away
- Environmental Clearance for Regularization of the existing project of Rolling… — cleared for impact study, 4.9 km away
- Regularization of the existing project of Rolling Mill having capacity of M.S… — lapsed, 4.9 km away
More from Atul Mishra in Lucknow
- Environmental Impact Assessment of Proposed Green Corridor from IIM Road to… — lapsed
- Proposed Green Road IIM Road To Hardinge bridge on Left hand side of Gomti River — lapsed
- Green Corridor Pipra Ghat To Shaheed path on Right Hand Side Of Gomti River — cleared for impact study
- Environmental Impact Assessment of Proposed Green Corridor from IIM Road to… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.