Project details
| Status | Initial checks |
|---|---|
| Status since | 23 Sept 2026 |
| Application filed | 17 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sumit Singh |
| Land area | 2.4 acres (1 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Bheekhpur |
| Taluk / tehsil | Hardoi |
| District | Hardoi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04229 |
In context
22 applications in Hardoi since January 2022 are in the same category (Mining): 11 approved, 11 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.4 acres, this one is smaller than 95% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Bheekhpur, Hardoi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Ordinary Soil Mining Project" at Gata No.- 146Mi & 129Mi — environmental approval granted, 900 m away
- Environmental clearance of proposed ordinary soil mining at Gata Nos. 25 & 28… — under environmental review, 1.2 km away
- Ordinary Earth Excavation Project at Gata No.- 104सं., 104मि., 104मि., 104मि.,… — under environmental review, 4.8 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit of Indian Oil… — more information requested, 6.8 km away
- Proposed "Ordinary Soil Mining Project" at Gata No.- 100, 95, 58, 80, 94 & 66 — environmental approval granted, 7.5 km away
- Ordinary Earth Mining project at Gata No.- 143mi, 175, 176, 177, 179, 185,… — environmental approval granted, 8.2 km away
- Ordinary Soil Excavation Mining Project — environmental approval granted, 12 km away
- Proposed BPCL Retail Outlet on Hardoi-Sandi Road (ODR) in Km. No. 04 (CH. No.… — lapsed, 12.3 km away
More from Sumit Singh in Hardoi
- Ordinary Soil Excavation Project at Gata No.- 3658 मि, 3675 मि, 3633 मि,… — under environmental review
- Ordinary Earth Mining project at Gata No.- 143mi, 175, 176, 177, 179, 185,… — environmental approval granted
- Ordinary Earth Mining Project — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.