Quick answers
What is Kataiya Sand/Morrum Mining Project?
Kataiya Sand/Morrum Mining Project is an approved mining project in Kataiya, Chail, Kaushambi, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Vijay Kumar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Apr 2026), as of 27 Nov 2026.
Where is it?
In Kataiya, Chail, Kaushambi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh and a site of 24.7 acres.
When was it filed?
The application was filed on 10 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 10 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Vijay Kumar Singh |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹70 lakh |
| Village / locality | Kataiya |
| Taluk / tehsil | Chail |
| District | Kaushambi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04244 |
In context
32 applications in Kaushambi since January 2022 are in the same category (Mining): 20 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 24.7 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Kataiya, Chail, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kataiya Sand/Morrum Mining Project (10.0 Ha) — under environmental review, 0 m away
- Kataiya Sand/Morrum Mining Project (10.0 Ha) — under environmental review, 0 m away
- Proposed riverbed morrum mining project from Yamuna River of Mohd. Arshad… — environmental approval granted, 1.3 km away
- Proposed riverbed morrum mining project from Yamuna River of Mohd. Arshad… — cleared for impact study, 1.3 km away
- Proposed riverbed morrum mining project from Yamuna River of Shri Kunwar… — environmental approval granted, 2.2 km away
- Proposed riverbed morrum mining project from Yamuna River of Shri Kunwar… — cleared for impact study, 2.2 km away
- Morrum Mine — lapsed, 4.8 km away
- Sand/Morrum mine, (on river bed of Yamuna river) Village Diya (Gata /Araji… — environmental approval granted, 4.9 km away
More from Vijay Kumar Singh in Kaushambi
- Kataiya Sand/Morrum Mining Project (10.0 Ha) — under environmental review
- Kataiya Sand/Morrum Mining Project (10.0 Ha) — under environmental review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.