One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of existing distillery unit capacity from 100 KLD to 500 KLD (Based on Cane…
Project details
| Official title | Expansion of existing distillery unit capacity from 100 KLD to 500 KLD (Based on Cane Sugar Syrup / Grains / B or C Heavy Molasses) along with expansion in co gen power capacity – 3.0 MW to 18.0 MW at village- Gola az andar, Barkatpur Azizpur, Hafizpur Mazidpur, Hafizpur Irshadpur, Tehsil: Gola, District: Lakhimpur Kheri, State: Uttar Pradesh of M/S Bajaj Hindusthan Sugar Ltd, Unit - Gola, Distillery Division. |
|---|---|
| Status | Lapsed |
| Status since | 2 Apr 2026 |
| Application filed | 17 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Bajaj Hindusthan Sugar Limited |
| Land area | 349.9 acres (141.6 ha) |
| Project cost | ₹565.1 crore |
| Village / locality | Gola |
| Taluk / tehsil | Gola Gokaran Nath |
| District | Kheri |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04248 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 17 Feb 2026 (this page) | Lapsed | 349.9 acres | ₹565.1 crore |
| Early planning filed 19 Jul 2024 | Cleared for impact study | 32 acres | ₹565.1 crore |
In context
14 applications in Kheri since January 2022 are in the same category (Industry): 13 approved, 0 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 349.9 acres, this one is larger than 93% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gola, Gola Gokaran Nath, Kheri, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of existing distillery unit capacity from 100 KLD to 500 KLD (Based… — cleared for impact study, 100 m away
- Four lane Gola Flyover at Km. 99.850 of NH-730 (Major Junction with State… — under forest review, 1.5 km away
- Golabahar Soil Mining Project — initial checks, 4 km away
- Proposed forest land to be diverted for Laying of Optical Fiber Cable along… — more information requested, 5 km away
- "Ordinary Soil Mining" Project at Gata No: -2752, 3000, Village: -Grant No-11,… — environmental approval granted, 5.9 km away
- Grant No. 11 Soil Mining Project — environmental approval granted, 7.1 km away
- "Ordinary Soil Mining" Project at Gata No.- 2315, 2316, 2591, Village: -Grant… — environmental approval granted, 7.6 km away
- Project for Laying of Optical Fiber Cable (OFC) — under forest review, 8.8 km away
More from Bajaj Hindusthan Sugar Limited in Kheri
- Expansion of Distillery from 200 KLPD (B-heavy Molasses/Sugar Syrup) to 630… — environmental approval granted
3 Bajaj Hindusthan Sugar projects in Kheri
All 13 Bajaj Hindusthan Sugar projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.