Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 20 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Paras Arora |
| Land area | 1,600 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Jampur |
| Taluk / tehsil | Shahjahanpur |
| District | Shahjahanpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04251 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jul 2026 (this page) | Environmental approval granted | 0.4 acres | ₹1.3 crore |
| Early planning filed 8 Sept 2025 | Cleared for impact study | 0.4 acres | ₹1.3 crore |
In context
29 applications in Shahjahanpur since January 2022 are in the same category (Industry): 25 approved, 4 filed or under review, and 0 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.4 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jampur, Shahjahanpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing of Phenol Formaldehyde (PF) Resin – 5000 TPA Melamine… — cleared for impact study, 0 m away
- Proposed manufacturing unit of Formaldehyde (400 TPD) Urea Formaldehyde Resin… — cleared for impact study, 450 m away
- CGD Network GA-11A.01 — forest land use approved, 1.5 km away
- Ajijpur Jignera Soil Mining Project — environmental approval granted, 1.6 km away
- Expansion of Ammonia and Urea Production — cleared for impact study, 2.8 km away
- Expansion of Ammonia and Urea Production — cleared for impact study, 2.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — in-principle approval, conditions pending, 2.8 km away
- New District Jail at Shahjahanpur, Uttar Pradesh (2132 Captive Capacity) — environmental approval granted, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.