What is this project?
Proposed "Granite And Dolostone Bailast (Gitti)" Project at Gata No.- Old 1370 New 3017 (Khand No.- 09), Village- Kulpahar, Tehsil- Kulpahar, District- Mahoba, U.P. (Applied Area- 2.024) M/s Prashant Enterprises, Prop.- Shri Prashant Ahirwar S/o Shri B. R. Ahirwar is a proposed mining project in Kulpahar, Mahoba, Uttar Pradesh. The site covers 5 acres.
Who is building it?
The applicant is Prashant Ahirwar.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kulpahar, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹73 lakh and a site of 5 acres.
When was it filed?
The application was filed on 23 Apr 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 6 Aug 2026 |
| Application filed | 23 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Prashant Ahirwar |
| Land area | 5 acres (2 ha) |
| Project cost | ₹73 lakh |
| Village / locality | Kulpahar |
| Taluk / tehsil | Kulpahar |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04268 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Oct 2026 | Initial checks | 5 acres | ₹73 lakh |
| Early planning filed 23 Apr 2026 (this page) | Under environmental review | 5 acres | ₹73 lakh |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is larger than 73% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 42.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Kulpahar, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Granite And Dolostone Bailast (Gitti)" Project at Gata No.- Old 1370… — initial checks, 0 m away
- BUILDING STONE AS KHANDA, BOULDER, GIITY MINING PROJECT AT ARAJI NO. 1370… — lapsed, 100 m away
- BUILDING STONE AS KHANDA, BOULDER, GIITY MINING PROJECT AT ARAJI NO. 1370… — cleared for impact study, 100 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 250 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — cleared for impact study, 250 m away
- Building Stone (Khanda, Gitti, Boulder) Mine — cleared for impact study, 300 m away
- Building Stone (Khanda, Gitti, Boulder) Mine — environmental approval granted, 300 m away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 300 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.