Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 5 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rahul Kumar |
| Land area | 2.3 acres (0.9 ha) |
| Project cost | ₹12 lakh |
| Village / locality | Mabaibilbari |
| Taluk / tehsil | Tirwa |
| District | Kannauj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04288 |
In context
86 applications in Kannauj since January 2022 are in the same category (Mining): 56 approved, 28 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.3 acres, this one is smaller than 62% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Mabaibilbari, Tirwa, Kannauj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land of Tirwa Bela Road Nh-91a and Reserve Forest… — lapsed, 5.7 km away
- Proposed Protected Forest Land To Be Diverted For Entry And Exit To Reliance… — more information requested, 6.1 km away
- Proposed "Ordinary Soil Mining" Project at Gata No.- 114, 116मि, 143मि,… — environmental approval granted, 6.3 km away
- "Ordinary Soil Mining" Project at Gata No.- 760, 761, 762, 763,… — under environmental review, 8.2 km away
- "Ordinary Soil Mining" Project at Gata No.- 1368, Village-Tikri Kalsan,… — environmental approval granted, 10.5 km away
- "Ordinary Soil Mining" Project at Gata No.- 89, 90, 91, 96, Village-Sakarbara… — environmental approval granted, 12.9 km away
- Ordinary Soil Mining" Project at Gata No.- 153, 154/2, 160,… — environmental approval granted, 13.6 km away
- Ordinary Soil Mining" Project at Gata No.- 153, 154/2, 160,… — initial checks, 13.6 km away
More from Rahul Kumar in Kannauj
- "Ordinary Soil Mining" Project at Gata No.- 209/5, 209/9, 209/10, 225, 244मि,… — under environmental review
- "Ordinary Soil Mining" Project at Gata No.- 105, 106, 107ख, 110ख, 116, 275,… — under environmental review
- "Ordinary Soil Mining" Project at Gata No.- 244मि, 273मि, 282/13, 282/18,… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.