Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 17 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Surendra Kumar |
| Land area | 5 acres (2 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Bhatauti |
| Taluk / tehsil | Meja |
| District | Prayagraj |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04324 |
In context
155 applications in Prayagraj since January 2022 are in the same category (Mining): 89 approved, 43 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 5 acres, this one is smaller than 91% of them.
9 other mining leases have applied within 500 m of this site; together with this one they cover 86 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 42 mining leases have applied within 5 km.
Where it is
Bhatauti, Meja, Prayagraj, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment clearance as per OM 28th April 2023 and OM 26th November 2024 for… — initial checks, 100 m away
- Environment clearance as per OM 28th April 2023 and OM 26th November 2024 for… — under environmental review, 100 m away
- Environment Clearance of Proposed Building Stone (Gitti/Boulder/Khanda) Sand… — under environmental review, 150 m away
- Proposed Building Stone (Gitti, Boulder, Khanda) Sand Stone mine at Araji… — environmental approval granted, 200 m away
- Proposed Building Stone (Gitti, Boulder, Khanda) Sand Stone mine at Araji… — cleared for impact study, 200 m away
- Building Stone (Gitti, Pathar, Boulder) Sand Stone mine at Araji No./Gata… — lapsed, 200 m away
- Building stone (Gitti, Boulder, Khanda) sand stone mine at Bhukhand… — under environmental review, 350 m away
- Proposed Project of "Sand Stone (Gitty/Patthar/Boulder) Mining Project"… — lapsed, 350 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.