Quick answers
What is this project?
Proposed Bus Terminal Commercial Complex (Be Together Center Point Ayodhya) at the UPSRTC Bus Terminal, situated on part of Khasra Nos. 1014, 1015, 1016, 1017, 1022, 1023, 1024, 1025, and 1026 by M/s Omaxe Be Together Ayodhya Dham Busport Private Limited is a proposed commercial project in Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. It plans 6 towers of up to 18 floors on 9 acres.
Who is building it?
The applicant is Omaxe Be Together Ayodhya Dham Busport Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh.
How big is it?
It has a stated cost of ₹219 crore and a site of 9 acres.
When was it filed?
The application was filed on 15 Jul 2026.
Project details
| Official title | Proposed Bus Terminal Commercial Complex (Be Together Center Point Ayodhya) at the UPSRTC Bus Terminal, situated on part of Khasra Nos. 1014, 1015, 1016, 1017, 1022, 1023, 1024, 1025, and 1026, in village: Manjha Barhata, Tehsil: Sadar, District: Ayodhya, Uttar Pradesh, by M/s Omaxe Be Together Ayodhya Dham Busport Private Limited |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 15 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Omaxe Be Together Ayodhya Dham Busport Private Limited |
| Use | Commercial |
| Towers | 6 |
| Floors (tallest) | 18 |
| Basements | 2 |
| Height | 72 m |
| Parking spaces | 1,854 |
| Land area | 9 acres (3.6 ha) |
| Built-up area | 1,88,573 m² (20,29,781 sq ft) |
| Plot area | 36,426 m² (3,92,086 sq ft) |
| Project cost | ₹219 crore |
| Village / locality | Mohsaria Majha |
| Taluk / tehsil | Faizabad |
| District | Ayodhya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04381 |
In context
15 applications in Ayodhya since January 2022 are in the same category (Buildings & townships): 11 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 9 acres, this one is larger than 53% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mohsaria Majha, Faizabad, Ayodhya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — more information requested, 850 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 850 m away
- Ordinary Sand Mine — environmental approval granted, 850 m away
- Ordinary Sand Mine — cleared for impact study, 850 m away
- River Bed Sand/Morrum Mining Project of Shri Gyanchand Jaiswal Village -… — returned to applicant, 950 m away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — environmental approval granted, 1 km away
- "Ordinary Sand Mining" from Riverbed of Ghaghara River — cleared for impact study, 1 km away
- Ordinary Sand Mine — initial checks, 1.1 km away
All 27 Omaxe projects across India