One of 2 filings for this project. The project's main page, with every filing and where each stands: Environmental Clearance of Expansion of existing Sugar Unit from 8000 TCD to 10000 TCD…
Project details
| Official title | Environmental Clearance of Expansion of existing Sugar Unit from 8000 TCD to 10000 TCD and co-gen power capacity from 10.0 MW to 16.0 MW within existing industry premises at village - Agwanpur, Tehsil & District – Moradabad, Uttar Pradesh of M/s Dewan Sugars Limited |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 30 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Dewan Sugars limited |
| Land area | 55 acres (22.3 ha) |
| Project cost | ₹60 crore |
| Village / locality | Aghwanpur |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04392 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 30 Oct 2026 (this page) | Under environmental review | 55 acres | ₹60 crore |
| Early planning filed 18 Jun 2024 | Cleared for impact study | 55 acres | ₹60 crore |
In context
20 applications in Moradabad since January 2022 are in the same category (Industry): 13 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 55 acres, this one is larger than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Aghwanpur, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance of Expansion of existing Sugar Unit from 8000 TCD to… — cleared for impact study, 0 m away
- Environmental Clearance of Expansion of existing sugar mill having cane… — environmental approval granted, 50 m away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 350 m away
- Raj Residency — lapsed, 3.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to Hotel of Mr.… — lapsed, 4.8 km away
- Saurabh Agarwal — lapsed, 5.5 km away
- PROTECTED FOREST LAND (FCA 1980 FOR NON FORESTRY USE) UNDER SOCIAL FORESTRY… — lapsed, 5.6 km away
- Suneeta Pachauri — more information requested, 5.8 km away
More from Dewan Sugars limited in Moradabad
- Environmental Clearance of Expansion of existing sugar mill having cane… — environmental approval granted
All 3 Dewan Sugars projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.