Project details
| Official title | Expansion in Cement Production Capacity of Standalone Grinding Unit from 1.3 Million TPA to 4.5 Million TPA (Phase – I: 1.3 to 1.5 Million TPA through process optimization in existing Mill and Phase II: 3.0 Million TPA by Installation of New Mill) at Village Ranauli- Latifpur, Tehsil: Dadri, District: Gautam Budh Nagar (Uttar Pradesh) by M/s. UltraTech Cement Limited (Unit: Dadri Cement Works) |
|---|---|
| Status | Environmental approval granted |
| Status since | 22 Jun 2026 |
| Application filed | 4 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | UltraTech Cement Limited |
| Land area | 60.5 acres (24.5 ha) |
| Project cost | ₹588 crore |
| Village / locality | Ranoli Latifpur |
| Taluk / tehsil | Dadri |
| District | Gautam Buddha Nagar (Noida) |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04406 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 4 Apr 2026 (this page) | Environmental approval granted | 60.5 acres | ₹588 crore |
| Early planning filed 3 Sept 2025 | Cleared for impact study | 60.5 acres | ₹588 crore |
In context
8 applications in Noida since January 2022 are in the same category (Industry): 6 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ranoli Latifpur, Dadri, Noida, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion in Cement Production Capacity of Standalone Grinding Unit from 1.3… — cleared for impact study, 0 m away
- Proposed Expansion in Existing Standalone Cement Grinding Unit from 2.4 MTPA… — under environmental review, 4.5 km away
- Proposed Expansion in the Cement Production Capacity of the Existing… — initial checks, 4.6 km away
- Diversion of Protected Forest Land Proposed To Be Diverted For The Widening… — in-principle approval, conditions pending, 5.1 km away
- Proposed Integrated Construction of Shiv Nadar Institution of Eminence Deemed… — cleared for impact study, 6.2 km away
- Proposed Integrated Construction of Shiv Nadar Institution of Eminence Deemed… — environmental approval granted, 6.2 km away
- Proposed integrated 6 GW Solar cell and 3 GW solar module manufacturing unit… — cleared for impact study, 8.3 km away
- Industrial Shed for Bakery and Confectionery Unit of Okas Ganga Private Limited — initial checks, 9.7 km away
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.