Quick answers
What is this project?
"Gitti/Patthar" Mine from Village- Kandaura, Gata No.- नया 434 (300 पुराना), Lease Area- 0.809 ha., Tehsil- Atarra, District- Banda, Uttar Pradesh, Project Proponent- M/s Jai Shri Sankat Mochan Stone Mill (Prop. - Shri Ram Singh) is an approved mining project in Kandohra, Atarra, Banda, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Ram Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Mar 2026), as of 27 Nov 2026.
Where is it?
In Kandohra, Atarra, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 2 acres.
When was it filed?
The application was filed on 7 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Mar 2026 |
| Application filed | 7 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ram Singh |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Kandohra |
| Taluk / tehsil | Atarra |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-04427 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 98% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kandohra, Atarra, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gitti/Stone Mine — initial checks, 1 km away
- Gitti/Stone Mine — cleared for impact study, 1.1 km away
- Proposed Mining of Gitti/Stone & Pahadi Morrum for Shri Rajesh Kumar Tripathi… — environmental approval granted, 6.8 km away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-315 (Khand… — under environmental review, 7 km away
- Building stone (Gitti/Patthar & Pahari Morrum) mine at Gata No.-315 (Khand… — under environmental review, 7 km away
- Riverbed Sand/Morrum Mining having lease area-9.340 ha along River Bagen in… — environmental approval granted, 10.8 km away
- Riverbed Sand/Morrum Mining having lease area-9.340 ha along River Bagen in… — cleared for impact study, 10.8 km away
- Sand / morrum Mining, Village – Mahuta , Tehsil- Atarra , District Banda Gata… — under environmental review, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.