Quick answers
What is Sand/Morrum Mining from Yamuna River Bed mining project?
Sand/Morrum Mining from Yamuna River Bed mining project is a proposed mining project in Garhiwa Majhgawan, Khaga, Fatehpur, Uttar Pradesh. The site covers 61.8 acres.
Who is building it?
The applicant is Anar Yadav.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Garhiwa Majhgawan, Khaga, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹8.2 crore and a site of 61.8 acres.
When was it filed?
The application was filed on 16 Oct 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 18 Nov 2026 |
| Application filed | 16 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Anar Yadav |
| Land area | 61.8 acres (25 ha) |
| Project cost | ₹8.2 crore |
| Village / locality | Garhiwa Majhgawan |
| Taluk / tehsil | Khaga |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04485 |
In context
62 applications in Fatehpur since January 2022 are in the same category (Mining): 42 approved, 18 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 61.8 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Garhiwa Majhgawan, Khaga, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Minor Mineral (Sand/ Morrum) — environmental approval granted, 700 m away
- Mining of Minor Mineral (Sand/ Morrum) — cleared for impact study, 700 m away
- Sand/Morrum Mining" from Riverbed of Yamuna River — initial checks, 1.2 km away
- Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 1.2 km away
- Sand/Morrum Mining from Yamuna River Bed mining project — under environmental review, 2.9 km away
- Sand/Morrum Mining from Yamuna River Bed mining project — under environmental review, 3.4 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 7.7 km away
- Riverbed Ordinary Sand/Morrum Mining Project from Gata No. 191, 269/3, 270 to… — environmental approval granted, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.