Quick answers
What is "Sand/Morrum Mining" from Riverbed of Betwa River?
"Sand/Morrum Mining" from Riverbed of Betwa River is a proposed mining project in Sikari Vyas, Orai, Jalaun, Uttar Pradesh. The site covers 32.1 acres.
Who is building it?
The applicant is Ranbhumi Tie Up Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sikari Vyas, Orai, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.6 crore and a site of 32.1 acres.
When was it filed?
The application was filed on 9 Jul 2026.
Project details
| Official title | "Sand/Morrum Mining" from Riverbed of Betwa River at Village- Sikrivyas, Gata No.- 1191/2, Khand No.- 05, Lease area- 13.00 Ha., Tehsil- Orai, District- Jalaun, Uttar Pradesh, Project Proponent- Ranbhumi Tie Up Pvt. Ltd. (Director- Shri Arpit Gupta S/o Shri Sunil Kumar Gupta) |
|---|---|
| Status | Under environmental review |
| Status since | 19 Nov 2026 |
| Application filed | 9 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ranbhumi Tie Up Private Limited |
| Land area | 32.1 acres (13 ha) |
| Project cost | ₹1.6 crore |
| Village / locality | Sikari Vyas |
| Taluk / tehsil | Orai |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04492 |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32.1 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Sikari Vyas, Orai, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Riverbed Sand / Morrum mining Area- 20.242 Ha Sand/Morrum Mining… — under environmental review, 1000 m away
- Proposed Riverbed Sand / Morrum mining Area- 20.242 Ha Sand/Morrum Mining… — cleared for impact study, 1000 m away
- Proposed "Sand/Morrum Mining Project" located at Gata No. 1191/2 Khand No.-7,… — under environmental review, 1.8 km away
- Proposed riverbed morrum mining project from Betwa River of M/s Vetrawati… — under environmental review, 2 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1193/916, 1191/2… — under environmental review, 2.8 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1193/916, 1191/2… — cleared for impact study, 2.8 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1193/916, 1191/2… — cleared for impact study, 2.8 km away
- Riverbed Sand/Morrum Mining Project having lease area 6.870 ha (16.99 acre)… — environmental approval granted, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.