Quick answers
What is this project?
Environment Clearance of proposed Granite and Dolostone ballast Gitti mine, Arazi no. 339, (khand No 08), Area- 0.8090 Village– Daharra, Tehsil- Mahoba, District–Mahoba, Uttar Pradesh of M/s Kaptan Construction is a proposed mining project in Daharra, Mahoba, Uttar Pradesh. The site covers 2 acres.
Who is building it?
The applicant is Krishna Kumar Singh.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Daharra, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 2 acres.
When was it filed?
The application was filed on 3 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 13 Oct 2026 |
| Application filed | 3 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Krishna Kumar Singh |
| Land area | 2 acres (0.8 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Daharra |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04716 |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2 acres, this one is smaller than 87% of them.
12 other mining leases have applied within 500 m of this site; together with this one they cover 41 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 37 mining leases have applied within 5 km.
Where it is
Daharra, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Granite & Dolostone Bailast (Gitti)" Project at Gata No.- 339 (Khand… — under environmental review, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 150 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 339… — environmental approval granted, 200 m away
- Proposed Project of "Building Stone as Granite (Khanda, Gitti, Boulder)"… — more information requested, 250 m away
- Proposed Project of "Building Stone as Granite (Khanda, Gitti, Boulder)"… — cleared for impact study, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 250 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.