Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Sept 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Malhotra Bothers |
| Land area | 40 acres (16.2 ha) |
| Project cost | ₹98 lakh |
| Village / locality | Chaura |
| Taluk / tehsil | Robertsganj |
| District | Sonbhadra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04731 |
In context
209 applications in Sonbhadra since January 2022 are in the same category (Mining): 162 approved, 22 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 40 acres, this one is larger than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 80 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Chaura, Robertsganj, Sonbhadra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand Morrum mining from Son Riverbed at Araji No.- 824 Kha (Khand No. 01) of… — lapsed, 500 m away
- Proposed Project of "Gitty/Boulder (Dolostone/Granite) Mining Project" located… — environmental approval granted, 950 m away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Sone River at Gata… — environmental approval granted, 1 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Sone River at Gata… — environmental approval granted, 1 km away
- Proposed Project of "Sand/Morrum Mining" on the riverbed of Sone River at Gata… — cleared for impact study, 1 km away
- Agori Khas Morrum Mining Project — environmental approval granted, 1.1 km away
- Proposed Project of Gitty/Boulder (Dolostone/Granite) Mining Project,located… — under environmental review, 2.1 km away
- Widening & Stengthenting of kargara to aluwar link road from Ch.00km to ch… — lapsed, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.