What is Developing? Open the mapMap

Returned to applicantMining · Mirzapur, Uttar Pradesh

Proposed Building Stone (Sand stone) mine, at Gata No./Araji No. /Plot no. – 01, Area 0.809 ha. (2.0 Acres)

Proposed Building Stone (Sand stone) mine, at Gata No./Araji No. /Plot no. – 01, Area 0.809 ha. (2.0 Acres) is a proposed mining project in Ahirupur, Chunar, Mirzapur, Uttar Pradesh. The site covers 2 acres. Its stated project cost is ₹54 lakh. As of 27 Nov 2026, its status is “Returned to applicant” (since 25 Jun 2026).

See it on the live map All projects in Mirzapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Building Stone (Sand stone) mine, at Gata No./Araji No. /Plot no. – 01, Area 0.809 ha. (2.0 Acres) is a proposed mining project in Ahirupur, Chunar, Mirzapur, Uttar Pradesh. The site covers 2 acres.

Who is building it?

The applicant is Ms Om Sai Construction.

Has it been approved?

Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.

Where is it?

In Ahirupur, Chunar, Mirzapur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹54 lakh and a site of 2 acres.

When was it filed?

The application was filed on 7 Feb 2026.

Project details

Official titleProposed Building Stone (Sand stone) mine, at Gata No./Araji No. /Plot no. – 01, Area 0.809 ha. (2.0 Acres) at Village – Ahirupur, Tehsil- Chunar, District- Mirzapur, Uttar Pradesh of M/s Om Sai Construction.
StatusReturned to applicant
Status since25 Jun 2026
Application filed7 Feb 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantMs Om Sai Construction
Land area2 acres (0.8 ha)
Project cost₹54 lakh
Village / localityAhirupur
Taluk / tehsilChunar
DistrictMirzapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-04838

In context

404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2 acres, this one is smaller than 95% of them.

4 other mining leases have applied within 500 m of this site; together with this one they cover 16.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 79 mining leases have applied within 5 km.

Where it is

Ahirupur, Chunar, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ms Om Sai Construction in Mirzapur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.