Quick answers
What is this project?
Building Stone or Granite, Khanda, Boulder, Ballast (Gitti) Mining Project is a proposed mining project in Majhol, Charkhari, Mahoba, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Kapil Maheshwari.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Majhol, Charkhari, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 3 acres.
When was it filed?
The application was filed on 29 Oct 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Building Stone or Granite, Khanda, Boulder, Ballast (Gitti) Mining Project
Project details
| Status | Initial checks |
|---|---|
| Status since | 16 Oct 2026 |
| Application filed | 29 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kapil Maheshwari |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Majhol |
| Taluk / tehsil | Charkhari |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04989 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Oct 2026 (this page) | Initial checks | 3 acres | ₹1.7 crore |
| Early planning filed 4 Oct 2023 | Cleared for impact study | 3 acres | ₹1.7 crore |
In context
310 applications in Mahoba since January 2022 are in the same category (Mining): 251 approved, 27 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 3 acres, this one is smaller than 59% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Majhol, Charkhari, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone or Granite, Khanda, Boulder, Ballast (Gitti) Mining Project — cleared for impact study, 0 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 288… — environmental approval granted, 100 m away
- "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata No.- 288… — cleared for impact study, 100 m away
- Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata… — environmental approval granted, 150 m away
- Proposed "Building Stone (Khanda, Boulder, Bailast (Gitti))" Project at Gata… — cleared for impact study, 150 m away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — environmental approval granted, 1.2 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — cleared for impact study, 1.2 km away
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — environmental approval granted, 1.2 km away
More from Kapil Maheshwari in Mahoba
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — environmental approval granted
- "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.