What is Kudari Morrum Mining Project?
Kudari Morrum Mining Project is a proposed mining project in Kurri, Garautha, Jhansi, Uttar Pradesh. The site covers 34.6 acres.
Who is building it?
The applicant is Dheerendra Gupta.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Kurri, Garautha, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹9.4 crore and a site of 34.6 acres.
When was it filed?
The application was filed on 8 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Jul 2026 |
| Application filed | 8 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Dheerendra Gupta |
| Land area | 34.6 acres (14 ha) |
| Project cost | ₹9.4 crore |
| Village / locality | Kurri |
| Taluk / tehsil | Garautha |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05010 |
In context
211 applications in Jhansi since January 2022 are in the same category (Mining): 146 approved, 39 filed or under review, and 26 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 34.6 acres, this one is larger than 83% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 69.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Kurri, Garautha, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Transfer of the EC for the Short Term Lease of Sand/ Morrum Mining from Betwa… — environmental approval granted, 100 m away
- "Morrum Mining along Betwa Riverbed" in Gata No 1ङ lease area 18.7000 ha — cleared for impact study, 4.1 km away
- Proposed project of Sand/Morrum Mining from Riverbed of Betwa River at Gata… — lapsed, 4.2 km away
- Sand/Morrum project from Araji No- 522 Gha, River- Betwa, Village- Behtar,… — environmental approval granted, 4.9 km away
- Sand/Morrum project from Araji No- 522 Gha, River- Betwa, Village- Behtar,… — cleared for impact study, 4.9 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — environmental approval granted, 4.9 km away
- Sand/Morrum Mining from Betwa River Bed Mining Project — cleared for impact study, 4.9 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — under environmental review, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.